Supporting sites for over 60 years

Email us: Call us: 01268 722300
  • Rawley Hire - Welfare unit Li (1)
  • Fire-Rated Cabins for Hire - Rawley Hire
Request a quote

Long-term site setups

Longer projects need site facilities that can support your team properly throughout the programme. Rawley Hire provides site accommodation, welfare units, toilet hire, storage, fire-rated cabins and support services for long-term site setups across London and the South East.

Whether your project needs multiple units, larger welfare facilities, secure storage or ongoing waste support, our team can help plan a practical hire solution that works for your site now and as requirements change.

Fire-Rated Cabins for Hire - Rawley Hire

Supporting your site throughout the project

Long-term sites often need more than a basic setup. As the project develops, workforce numbers can increase, site layouts can change and additional facilities may be needed.

Rawley Hire can help you choose a setup that supports daily site operations, while giving you the flexibility to adapt as the programme progresses.

From secure office and welfare space to toilets, storage, waste tanks and fire-rated options, we can help bring the right facilities together into a practical long-term hire solution.

Products suited to longer site programmes

Anti-vandal site accommodation

Anti-vandal cabins provide secure, durable accommodation for offices, canteens, drying rooms and general site facilities. For longer projects, units can be combined or double stacked to create a more complete site setup.

Welfare units

Long-term sites need facilities that are comfortable, reliable and suitable for the number of people on site. Larger static units, office and welfare units can help support teams over an extended hire period.

Fusion Li welfare units may also be suitable for longer projects where reducing fuel use, generator runtime, servicing and site noise is a priority.

Fire-rated cabins

Where cabins are positioned close to buildings, structures or other site accommodation, fire-rated units may need to be considered. Planning this early can help avoid layout issues later in the project.

Rawley Hire - Welfare unit Li (1)

Toilet hire

Mains-connected toilet units can provide reliable facilities for longer-term projects where water and drainage are available. For larger teams, multiple units or larger toilet blocks may be required.

Storage containers

Secure storage is essential on longer sites where tools, materials and equipment need to remain protected throughout the project. Larger containers or multiple storage units may be suitable as site activity increases.

Waste services

For sites without mains drainage or water, waste tanks and water bowsers can help support toilet and welfare facilities. Scheduled servicing can also help keep facilities operational throughout the hire period.

How can we help

Providing a scalable suite of solutions

As your project evolves, so can your setup. Add or remove units as your needs change, without the hassle of starting from scratch.

Hire from a single point of contact

From your initial enquiry through to delivery and servicing, you'll deal with one team throughout. Straightforward support from start to finish.

Built for sustained, long-term use

Well-maintained, modern equipment that keeps your site operational for as long as your project runs.

What to consider for a long-term setup

  1. Will your workforce change?

    Longer projects often have changing workforce numbers. It is worth planning for peak site activity, not just the number of people on site at the start.

  2. Do you need multiple types of space?

    A long-term setup may need offices, canteens, drying rooms, toilets, storage and welfare facilities. Planning these together can make the site easier to manage.

  3. Is space limited?

    If your site has a restricted footprint, stacked cabins or combined unit options may help you make better use of available space without reducing facilities.

  4. Are fuel use and servicing important?

    For longer hire periods, fuel use, generator runtime and servicing requirements can have a bigger impact on site running costs and day-to-day management.

    Fusion Li welfare units may help reduce generator runtime, fuel use, servicing requirements and site noise, making them worth considering for longer-term setups.

  5. Are fire-rated units required?

    If units are close to existing buildings, structures or other site accommodation, fire-rated cabins may need to be included in the site layout.

  6. Will the site layout change over time?

    As work progresses, your accommodation, welfare and storage requirements may change. Choosing flexible hire options can make it easier to adapt the setup as the project develops.

Built for ongoing site support

Rawley Hire supports long-term projects with practical advice, reliable units and responsive service across London and the South East.

Our team can help you plan your initial setup, review what your site needs over time and advise on additional units or services if requirements change.

The aim is to provide a setup that works throughout the hire period, not just on day one.

Get in touch

Whatever your site needs, our team is on hand to help you find the right solution.

Speak to our team

Call us
01268 722300

Address

Rawley House,
Harvey Road,
Burnt Mills Industrial Estate,
Basildon,
Essex,
SS13 1RP







    © 2026 Rawley. All Rights Reserved

    By Everglow